The Situation
The most prolific RV manufacturer in the country planned a relocation of its corporate offices and data center. This was the first step of several planned remodel and expansion projects over the next 5 years. We competed with other vendors and were not the lowest bid. We came in with the smartest bid. We proposed the most comprehensive solution and asked the right questions. With our certified BICSI engineers and installers, we were engaged early in the data center design process ensuring success.
we like to be involved early in the process to brainstorm.
The Solution
Through collaborative efforts with the owner’s representatives, we designed a reliable, scalable, low voltage cabling network that exceeds today’s data network needs, and will meet tomorrow’s. Through our demonstration of design expertise and installation quality, we have become the “go-to” information transport system vendor for this iconic RV manufacturer. We have partnered on several additional ongoing projects.
we excel at collaboration.